Installing Hardwood Floors With Glue
Once you have decided to use the glue down floor method make sure that you leave a large enough expansion gap depending on the hardwood product you chose from the wall to allow the wood to contract and expand.
Installing hardwood floors with glue. Glue down engineered hardwood using a glue down method you can install hardwood directly over most subfloors including concrete. Do not pre spread the adhesive over the entire sub floor as it will dry before you get to. Installing a glue down engineered hardwood floor step 1. Installing hardwood flooring glue down method step by step instructions.
With the floor prepped spread flooring adhesive with trowel spreading enough to work on a few rows at time so the glue doesn t dry. If installing glue down hardwood flooring in a new house completely close the building in with all outside doors and windows in place. To determine the best method you need to look at the home and your geographic area and see which is right for the floor. Pass the trowel through the glue at a 45 degree angle and install engineered flooring immediately after the adhesive is spread.
This is your last chance to check if the ground is level and has no lumps or stray rocks so use it wisely. Glue will typically set in about 60 minutes hold your trowel at a 45 degree angle spread the glue in small sections. Use a notched trowel to spread the adhesive. The weight of the wood holds the floor in place without nails or glue.
The wall coverings and painting should be completed before the installation of the hardwood flooring. Here s how to install using the glue down method. You ll want to lay down a pad or underlayment to reduce noise and act as a moisture barrier before laying the flooring. The specific product instructions will dictate what type of trowel and adhesive should be used.
This may include polymeric resin moisture cure urethane water based adhesive acrylic or a hybrid product. The adhesive manufacturer should have instructions regarding specific trowel requirements. Laminate floors or engineered wood floors meant for floating installation use tongue and groove or another system to lock them in place. All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.
Set the expansion gap lay spacers along the walls to create the expansion gap specified in the manufacturer s instructions. While installing be sure to do small areas at a time. After making sure the surface is completely level and clean place the substrate sheets on the ground and stretch them out properly. Only spread the adhesive over small areas ahead of you at any given time.